Manual for General Cocks egg incubator


Operating the General Cocks is very simple but please note that for success in hatching operation you must first read the manual carefully.


General Notes

● Before putting eggs into the machine, it should work for 1-2 days to make sure that every parts work correctly.
● If you do not have enough experience to use the machine, it is recommended, not to use expensive eggs. Start with some cheap eggs.
● Do not install the machine outdoor and under direct sun light or wind.
● The ideal temperature of the room is between 23-27 degrees, otherwise the output decreases.
● When using air conditioning systems, make sure that the machine is not exposed to the warm or cold wind.
● Enclosed and poorly ventilated spaces are not recommended.It will reduce efficiency.
● There are some inlets under the machine to enter fresh air. Do not put the machine on the carpet or any floor covering those inlets.
● Please note that the ventilation channel on the machine's door must be open all the time.
● During the hatching period (3last days) especially when some chicks have been hatched, do not open the machine's door.
● Do not manipulate the electronic systems.
● Ideal humidity of atmosphere is between 50-55 percent.

3 issues are involved in this process:
   1- Egg incubator
   2- Eggs
   3- Operator

● Do not use old eggs. maximum time of storage eggs is 7 days. also eggs must be stored in special condition.
● Do not store eggs in refrigerator. the best temperature is 18 degrees and humidity is 55%. store them in dark places.
● Temperature fluctuation of the environment should not be more than 4 degrees.
● If the temperature fluctuation is more than 4 degrees, output decreases.
● Before putting eggs in the machine, put them in a warm place for some hours (about 25 degrees) to prevent any shock.
● To put the eggs in the machine, make sure that the eggs stand on their head.
● Do not wash the eggs; clean them with a dry brush.
● Do not use very big or small or abnormally shaped eggs.
● Do the egg candling on the 7th and 14th nights and remove transparent eggs from the machine because they are without embryos and can cause the rest of the eggs be contaminated.
● It is suggested that after each period, break the unsuccessful eggs and check out the reason. Note that if after 21 days, eggs still have albumen and yolk it means that they do not have sperm at all.
● Do not use any chemical for cleaning the machine.

Incubation process definition

?

Incubation process is divided to 2 periods of setter and hatch.
• During setter period, the egg is on the tray and turns. In this period the chick grows inside the eggs. Ideal temperature is 37.7 and ideal humidity is 55-65%.
• In hatch period, chick inside the egg is completed .in this period eggs must be put on the hatch basket. Hatch period for chicken eggs is 3 days.

Egg Candling

For the diagnosis of fertilized eggs and also to ensure the growth of the embryo, do the egg candling on the 7th and 14th nights .
1-Do the egg candling in a dark room.
2- Do the egg candling in a warm room to prevent any shock.
3- Make sure that during egg candling the egg is not exposed to intense shaking.
4- Do the egg candling in the shortest time.
5- Remove the transparent eggs from the machine otherwise the rest of the eggs will be contaminated.

How can you do the candling?

While looking through eggs on seventh night, you must see blood vessels and black spots, otherwise remove transparent eggs.



On the 14th night, if you observe eggs, you must see most of the inside dark, otherwise remove transparent eggs again.

Introduction of machine's parts

1- Body: it is made of PVC with 3 cm thickness insulation layer.
2- Controllers: Two digital thermo controllers with the precision of a tenth of a degree. One of them works as a main thermo controller and another one is for emergency.
Two digital humidity controllers with the precision of 1%. One of them works as a main humidity controller and another one is for emergency.

In normal situation main controllers work and set the temperature and humidity.
Note that two thermo controller (main and emergency) should not have a difference more than 0.5 degree. Also two humidity controller (main and emergency) should not have a difference more than 5 percent.
While the inside temperature is lower than adjusted value, the thermostat green light is on and when the temperature reaches to the adjusted value, the green light off.

Note: the machine is adjusted in the factory. Do not change the setting.

3- Fan (blower):

Note: the machine's fan must work all the time .check the fan daily and make sure that it works properly.
After each period clean the fan carefully.
4- Electricity:


This machine only works with 220 volt electricity.
In case of any short cut, the fuse will burn so you must change it.
There is a spare fuse in the package. The fuse must be 10A.

5- Mist maker (humidifier):

While the humidity is lower than 60% (adjusted value), the red light of the mist maker is on and it still works.
Note: due to water hardness in different areas, the guarantee does not include the mist maker.
Use distilled water because heavy and salty water causes deterioration of ultrasonic part.
Every few days pour some water in the water container and make sure that the water level is upper than mist maker metal tip.

6- Egg Candler: doing egg candling on the 7th and 14th nights.
7- Tray: this machine has 3 kinds of trays for all kind of bird eggs. You can watch the method of changing trays on the video.

Note: turning the eggs cannot be seen easily. To make sure that the gearbox works, put your hand on it and you must feel its shake and warmth.
The machine has 5 shelves and each shelf has a separate gearbox.
The red light of the signals means that they are working.

Connect the gearboxes to the specified places and make sure the gearboxes wires are completely fixed in the signals.


8- Water container:It is washable and you can change it easily.

Machine installation

- Put trays in the machine and connect the gearboxes.
- Pour some water in the water container and make sure the water level is upper than metal tip.
- turn the machine on:
1- All the 4 digital controllers must be on
2- All the 5 signal lamps (gearboxes) must be on.
3- The red light of the fan must be on and fan works.
4- While the humidity is lower than 60%, the red light of the mist maker must be on and it works.

Note: the machine is adjusted in the factory, do not change the setting.


Note: before putting eggs in the machine, let it works for a day to make sure that every part works properly.
- Then put the eggs .Eggs must be stand on their head. Close the machine door and make sure that air cannot enter.
During the 18 days of setter, every 3 days pour water in the machine.
- The ideal temperature inside the machine is 37.5 -37.7 degree and the ideal humidity inside the machine is 55-65%.
- In the 7th and 14th nights, do the candling with considering all important notes.

How to use the emergency controllers

In case of disorder in any of main controllers, use emergency.
• Turn the machine off.
• Remove shelves
• Remove the plastic basket on the top of the machine to see the inside of the panel.
• Disconnect the wire behind the main controller and connect it to the emergency with considering the direction.
All steps of changing controllers are shown in the training video.

Hatching operation

- Remove the trays from the machine.
- Put the eggs in the glass baskets.
- Pour water in the water container to make sure that there is no need to open machine door during rest of days.
Note: Operation of transferring eggs must be done in a warm room to prevent any shock.
- Close the machine door and do not open it during the 3 last days.
It suggested to open the door on the 2nd and 4th day, then take the chicks out, because with each opening and closing the door some chicks could die.
The humidity will rise while chicks hatching; in this case remove the plastic plug on the glass to remove the extra humidity.
The hatching of all chicks may extend to the 25th day.
After each period and before starting new period, make sure that all inlets in the front of the fan and on the top of the machine are open.

Period of incubation

Poultry Period of incubation
chicken 21
Peacock 28
Ostrich 42
Goose 28-31
Swan 30
Pigeon 16-18
Pheasant 20-24
Quail 17-18
Partridge 23-25



تشغيل الجهاز General Cocks او جهاز التوأم هو بسيط جدا ولكن يرجى ملاحظة أن للنجاح في عملية الفقس يجب أولا قراءة الدليل بعناية.

ملاحظات عامة

● قبل وضع البيض في الجهاز، يجب أن یعمل لمدة 1-2 أيام للتأكد من أن كل جزء يعمل بشكل صحيح.
● إذا لم يكن لديك ما يكفي من الخبرة لاستخدام الجهاز، فمن المستحسن، عدم استخدام البيض المكلفة. فعلیک أن تبدأ مع بعض البيض الرخيصة.
● لا تقم بتثبيت الجهاز في الهواء الطلق وتحت ضوء الشمس المباشر أو الرياح .
● فلتکن درجة الحرارة المثالية لمكان الجهاز بين 23-27 درجة، وإلا فإن الإخراج يقلل.
● عند استخدام أنظمة تكييف الهواء، تأكد من أن الجهاز غير معرض للرياح الدافئة أو الباردة لا ينصح الأماكن المغلقة مع سوء التهوية لانها تسبب تقليل الكفاءة التهوية .
● هناك بعض المداخل تحت الجهاز لإدخال الهواء النقي. فلا تضع الآلة على السجادة أو أي أرضية تغطي تلك المداخل.
● يرجى الانتباه أن قنوات التهوية في الجزء العلوي من الجهاز وفي الجزء الأمامي من المروحة يجب أن تكون مفتوحة في كل وقت.
● يرجى ملاحظة أن قناة التهوية على باب الجهاز يجب أن تكون مفتوحة طوال الوقت .
● خلال فترة الفقس (آخر 3 أیام) خاصة بعد تفريخ بعض الفراخ، لا تفتح باب الماکینة .
● لا تتلاعب بالانظم الإلکترونیة
● الرطوبة المثالية للغلاف الجوي المحیط تتراوح بين 50-55 في المئة

وتشارك 3 قضايا في هذه العملية:
   1. حاضنة البيض
   2. البيض
   3. المشغل اوعامل الانساني

● لا تستخدم البيض القديم. الحد الأقصى للوقت من تخزين البيض هو 7 أيام. كما يجب تخزين البيض في حالة خاصة.
● لا تخزن البيض في الثلاجة. أفضل درجة حرارة هو 18 درجة والرطوبة 55٪. ویتم تخزينها في الأماكن المظلمة.
● التذبذب في درجة الحرارة من البيئة لا ينبغي أن يكون أكثر من 4 درجة.
● إذا كان تذبذب الحرارة أكثر من 4 درجة، سیحصل انخفاض في الانتاج. أيضا كن حذرا من التفاوت في درجة الحرارة من النهار والليل.
● قبل وضع البيض في الجهاز، قم بوضعها في مكان دافئ لبضع ساعات (حوالي 25 درجة) لمنع الصدمة.
● لوضع البيض في الجهاز، تأكد من أن البيض تقف على رأسها.
● لا تغسل البيض؛ قم بتنظيفها مع فرشاة جافة.
● لا تستخدم بيض كبير جدا أو صغير أو غير طبيعي الشكل.
● اقدم بفحص البيض على لیالي 7 و 14 وقم بإزالة کل من البيض الشفافة من الجهاز لأنها دون الأجنة ويمكن أن تتلوث بقية البيض بسببها.
● ويقترح أن بعد كل فترة من الفقس كسر بيض غير الناجحة وتحقق من السبب. لاحظ أنه إذا كان البيض بعد 21 يوما لا يزال لديها الزلال والصفار فهذا يعني أنه ليس لديها الحيوانات المنوية على الإطلاق.
● لاتستخدم أي مادة كيميائية لتنظيف الآلة.

تعريف عملية الحضانة

تنقسم عملية الحضانة إلى 2 فترات الضبط والفقس.
• أثناء فترة الضبط، تكون البیض على درج الصینیة حیث تدور و تتحول. في هذه الفترة ینمو الفرخ داخل البيض. درجة الحرارة هي 37.7 والرطوبة المثالية هي 55-65٪.
• في فترة الفقس، يتم الانتهاء الفقس بالنسبة للفرخ داخل البيض .في هذه الفترة يجب وضع البيض على سلة الفقس. فترة الفقس بالنسبة لبيض الدجاج هي 3 أيام.

كيف يمكنك أن تفعل فحص التشخیص؟

لتشخيص البيض المخصب وأيضا لضمان نمو الجنين، قم بفحص التشخیص للبيض على لیال 7 و 14.
1- قم بفحص البيض في غرفة مظلمة.
2- قم بفحص البيض في غرفة دافئة لمنع أي صدمة.
3- تأكد من أنه خلال فحص البيض، انها لا تتعرض لهزة شدیدة.
4- قم بفحص البیض في أقصر وقت.
5- قم بإزالة البيض الشفافة من الجهاز وإلا سيتم تلوث بقية البيض.

كيف يمكنك أن تفعل فحص التشخیص؟

أثناء النظر من خلال البيض في الليلة السابعة، يجب أن ترى الأوعية الدموية والبقع السوداء، وإلا فقم بإزالة البيض الشفافة.



في ليلة ال 14، إذا لاحظت البيض، يجب أن ترى معظم قسم الداخل للبیض مظلما، والا فقم بإزالة البيض الشفافة مرة أخرى.

مقدمة في أجزاء الجهاز

1- الجسم: وهي مصنوعة من PVCمع 3 سم سماكة في طبقة العزل.
2- وحدات التحكم: توجد اثنتان من وحدات التحكم الحرارية الرقمية مع دقة عشر من درجة.الاولی منهماتعمل بمثابة وحدة تحكم الحرارية الرئيسية والاخریهي لحالات الطوارئ.
ولدی الجهاز ایضا اثنتان من وحدات التحكم الرطوبة الرقمية مع دقة 1٪. منهماتعمل وحدة تحكم الرطوبة الرئيسية واخری وحدة لحالات الطوارئ.
في الوضع العادي تقوم بالعمل وحدة الرئيسية وتضبط درجة الحرارة والرطوبة.
لاحظ أن لکل من اثنيتن وحدات التحكم الحرارية (الرئيسية والطوارئ) لا ينبغي أن يكون لدیهما الفرق أكثر من 0.5 درجة حراریة. أيضا لدی الاثنتين من وحدات تحكم الرطوبة (الرئيسية والطوارئ) لا ينبغي أن يكون الفرق أكثر من 5 في المئة.

في حين أن درجة الحرارة في الداخل أقل من المقدارالمضبوط، يستمر الضوء الأخضر بالضیاء لدی منظم الحرارة وعندما تصل درجة الحرارة إلى المقدار المضبوط، سيتم إيقاف الضوء الأخضر.
ملاحظة: يتم تعديل الجهاز وتعییره في المصنع، فلا تقم بتغيير الإعداد.

3- المروحة

بعد كل فترة قم بتنظيف المروحة بعناية.

4- الطاقة الكهربائية:
يمكنك مشاهدة طريقة توصيل الطاقة الكهربائية في الصورة.

هناك مصهر الغيار في الحزمة. يجب أن يكون المصهر من نوع10A.
5- صانع الضباب (المرطب):

في حين أن الرطوبة أقل من 60٪ (المقدار المضبوط)، یضیء ضوء ألاحمر من صانع الضباب وهو یداوم العمل.
ملاحظة: بسبب صلابة المياه في مناطق مختلفة، الضمان لا یشمل صانع الضباب.
استخدم ماء المقطر لأن المياه الثقيلة والمالحة تسبب التدهور في الجزء فوق الصوتية.
صب بعض الماء كل بضعة أيام في حاوية المياه والتأكد من أن مستوى المياه هو اعلی من طرف المعدني لصانع الضباب.
6- فحص تشخیص البيض: قيام بفحص البيض على الليالي السابع والرابع عشر.

7- صينية: هذا الجهاز لديه 3 أنواع من الصواني لكل نوع من الطيور.
يمكنك مشاهدة طريقة تغيير الصواني على الفيديو.

ملاحظة: تحول البيض و دورانها لا يمكن أن ينظر إليه بسهولة. للتأكد من أن علبة التروس يعمل، وضع ضع يدك على الجهاز فيجب أن تشعر بالهزة و الدفء.
الجهاز يحتوي على 5 رفوف وكل رف لديه علبة التروس منفصلة.
الضوء الأحمر للإشارات البيضاء يعني أنها تعمل.


قم بتوصيل علب التروس إلى الأماكن المحددة وتأكد من أن أسلاك علبة التروس ثابتة تماما في الإشارات.

8- حاوي المياه:فهي مما قابل للغسل ويمكنك ابدالها بسهولة.

تركيب الجهاز

» ضع الصواني في الجهاز واربط علب التروس.
» صب بعض الماء في حاوية المياه وتأكد من مستوى المياه ان یکون اعلی من طرف معدني
» قم بتوصيل طاقة الكهرباء وتشغيل الجهاز علی تفاصیل القادمة:


1- يجب أن تكون جميع وحدات التحكم الرقمية الاربعةمشتغلة
2- يجب أن تكون جميع مصابيح إشارة الخمسة (علبة التروس) مضویة.
3- يجب أن يكون الضوء الأحمر للمروحة مضوياوالمروحة تشتغل.
4- في حين أن الرطوبة تکون أقل من 60٪، يجب أن يكون الضوء الأحمر من صانع الضباب مشتعلا و الصانع يعمل.
ملاحظة: يتم تعديل الجهاز وتعییره في المصنع، فلا تقم بتغيير الإعداد.
ملاحظة: قبل وضع البيض في الجهاز، دعه يعمل لمدة يوم للتأكد من أن كل جزء يعمل بشكل صحيح.
ثم قم بوضع البيض. يجب أن یكون وقوف البيض على رأسها. أغلق باب الآلة وتأكد من عدم دخول الهواء.
خلال 18 يوما من الإعداد، صب الماء في الجهاز کل 3 أیام.
درجة الحرارة المثالية داخل الجهاز هي 37.5 -37.7 درجة والرطوبة المثالية داخل الجهاز 55-65٪.
في الليالي 7 و 14، قم بفحص التشخیص ومعاینة الجهاز مع النظر في جميع الملاحظات الهامة.

كيفية استخدام وحدات التحكم في حالات الطوارئ

في حالة الفوضى في أي من وحدات التحكم الرئيسية، استخدم الطوارئ.
• أوقف تشغيل الماكينة.
• قم بإزالة الرفوف
• قم بإزالة السلة البلاستیکیة الموجودة في الجزء العلوي من الماکینة لترى داخل اللوحة.
• افصل السلك خلف وحدة التحكم الرئيسية وقم بتوصيله بوحدة الطوارئ مع مراعاة الاتجاه.
يتم عرض جميع خطوات ابدال وحدات التحكم في الفيديو التدريب.

عملیة التفقیس

- قم بإزالة الأدراج من الجهاز.
- ضع البيض في السلال الزجاجية.
- صب الماء في حاوية المياه للتأكد من عدم وجود حاجة لفتح باب الجهاز خلال بقية الأيام.
ملاحظة: عملية نقل البيض يجب تتم في غرفة دافئة لمنع أي صدمة.
- أغلق باب الماكينة ولا تفتحه.
و قد یقترح فتح الباب في اليومين الثاني والرابع، ثم أخرج الكتاكيت، لأنه مع كل فتح وإغلاق الباب بعض الفراخ يمكن أن يموت.
الرطوبة سوف ترتفع بينما الكتاكيت تفقس؛ في هذه الحالة قم بإزالة المكونات البلاستيكية على الزجاج لإزالة الرطوبة الإضافية.
وانه یمکن بأن تفريخ جميع الكتاكيت يمتد إلى اليوم الخامس والعشرين.
بعد كل فترة وقبل بدء فترة جديدة، تأكد من أن جميع مداخل في الجزء الأمامي من المروحة وعلى الجزء العلوي من الجهاز مفتوحة.

فترة الحضانة والفقس (یوما)

الدواجن فترة الحضانة والفقس (یوما)
دجاج 21
طاووس 28
نعامة 42
إوز 28-31
تم (إوز عراقي) 30
حمام 16-18
تدرج 20-24